Danfoss Power Solutions - Neumünster

Ventilation upgrade, executed by Belvent A/S as the main contractor

Belvent Project No.: 2018-159

The project scope included:

  • Delivery and installation of jet and louvre hoods for the new ventilation system, both sized for 90,000 m³/h.

  • Delivery and installation of connection ducts between the new ventilation systems, as well as between extraction boxes and supply air boxes.

  • Modification of the existing ventilation system.

  • Establishment of connections from the recirculation system, designed for 65,000 m³/h with low pressure drop.

  • Roof penetrations for supply and exhaust air.

  • Production, delivery, and installation of various transition pieces, ducts, and related installations.

  • Bag‑inflation supply to the production hall, ensuring 130,000 m³/h of supply air from the recirculation system.