Hålogaland Bridge
N: 68°27’34.722’’ E:17°28’54143’’
Dehumidification
Belvent A/S was responsible for the design and installation of the dehumidification system for the main cables, towers, anchor chambers, and bridge girder.
The installed system includes recirculation of the dehumidified air, making it the first of its kind worldwide.
Wrapping
The project was carried out in close collaboration with Davai through the Belvent & Davai Joint Venture, EWG – European Wrapping Group A/S, which was responsible for the successful wrapping and sealing of the main cables.
Davai also carried out several other major tasks on the bridge.
Project Partners:
SRBG - Sichuan Road & Bridge Group (Main Contractor)
EWG - European Wrapping Group A/S
Davai A/S
Fyns Energiteknik A/S
COWI A/S
Statens Vegvesen